Company Name:
Lishui Huanqiu Bearing Trading Co., Ltd.
Company Address:
No.11 Shiting Road, Shuige Industrial Zone,Lishui, Zhejiang,China
Contact Person: William
Email: admin@tradebearings.com
Homepage: www.asiabearings.com
Bearing B2B: www.tradebearings.com
1) must be the person in charge of the unified command of the scene, construction
responsible person assigned to check the mechanical rigging, tools and instruments, endless good is strictly prohibited.
2) The site person in charge of the lifting location carefully examined to confirm whether the firm and safe, be sure before construction.
3) Lifting the bottom of things is strictly prohibited job or stay, pulled down the chain must stand to be lifting material above the place of safety operations.
4) Lifting is prohibited by hand, foot direct sliding and lifting objects.
5) Do not overload the lifting.
6) The lifting hand observe the lifting of the changes to be set up, found special circumstances to immediately cease operations until the handle before it can continue lifting.
7) Located in the lifting of hand to check the connecting ring, to ensure continuous and reliable.
8) lifting should first try hanging 100mm, send someone to check the lifting of connecting links, especially the lifting link connection point and tie clip in good condition to ensure reliable connection.
9) Lifting to be stable for lifting material from the stable release, smooth operation.
10) Lifting personnel standing on the operation of a safe place, and must obey the instructions of the commanding officers operating.
(3) Handling the bearing German safety precautions:
1) bearing heating is completed, and even heating oil drums with loading transported to the North Wing Bypass +1058 yard handling by the staff to the head of the north wing.
2) In the process of loading, unloading, shall not be savage job to maintain a smooth barrel up and down, to prevent the barrel to tilt the oil spill burn personnel.
3) Personnel in the handling process, the bar rods, ropes and other tools must be intact and reliable, special command, before and after the staff to maintain a certain interval, all along the shoulder, in unison. In the last step, the handling staff must pay attention to the station, every step of the solid footing to prevent slipping.